[1] | Republic of South Africa. 2007. Policy Framework for the Government-Wide Monitoring and Evaluation System. The Presidency, Pretoria, South Africa. |
|
[2] | GRZ. Ministry of Finance and National Planning. 2006. Fifth National Development Plan 2006-2010: Broad based wealth and job creation through citizenry participation and technological advancement, Lusaka: Ministry of Finance and National Planning. |
|
[3] | Hardlife, Z. & Zhou, G. 2013. Utilisation of monitoring and evaluation systems by development agencies: The case of the UNDP in Zimbabwe. American International Journal of Contemporary Research, 3(3): 70-83. |
|
[4] | Bamberger, M. 2008. Enhancing the utilisation of evaluations for evidence-based policy- making. In M. Segone (Ed.). Bridging the Gap. Switzerland: UNICEF. |
|
[5] | Abraham, I.J. & Torres, M.M. 2004. Mainstreaming Empowerment in the Bolivia PRSP monitoring and evaluation at the Municipal Level. Special series on social accountability in Latin America and the Caribbean. The World Bank, Washington, D.C. |
|
[6] | Republic of South Africa. 2008. Basic Concepts in Monitoring and Evaluation. Public Service Commission, Pretoria, South Africa. |
|
[7] | Edmunds, R. & Marchant, T. 2008. Official Statistics and Monitoring and Evaluation Systems in Developing Countries: Friends or Foes?, (October): 1-43. |
|
[8] | Adrien, M.H. 2003. Evaluation Capacity Development: Guide to Conducting Reviews of Organisations Supplying M&E Training, ECD Working Paper Series No. 9, The World Bank, Washington, D.C. |
|
[9] | Kanyamuna, V., Phiri, M., Kanenga, H. & Mulonda, M. (2020). “Role of Actors Outside Government in Strengthening the Country Monitoring and Evaluation System in Zambia.” World Journal of Social Sciences and Humanities, vol. 6, no. 1: 22-29. |
|
[10] | Ahmad, R. 2008. Governance, Social Accountability and the Civil Society. JOAAG, Vol.3. No.1. |
|
[11] | GRZ. Ministry of National Development Planning. 2014 Annual Progress Report for the Revised Sixth National Development Plan 2013-2016: People Centred Economic Growth and Development. Lusaka: Ministry of National Development Planning. |
|
[12] | Ostrom, E., Gibson, C., Shivakumar, S. & Andersson, K. 2002. Aid, Incentives, and Sustainability: An Institutional Analysis of Development Cooperation, Workshop in Political Theory and Policy Analysis, Indiana University, Sida Studies in Evaluation 02/01. |
|
[13] | Akhtar, T., Ebrahimian, E., Prasad, B., and Tavera, C. (Eds.). 2005. Partners for Change. Experiences from UNDP’s work with civil society organizations through the Global Environment Facility. |
|
[14] | Alzate, R. D. E. 2000. Monitoring and evaluating local development through community participation: The experience of the Association of Indigenous Cabildos of Northern Cauca, Columbia. In M. Estella, J. Blauert, D. Campilian, J. Gaventa, J. Gonsalves, I. Guijt, D. Johnson, & R. Riacafort (Eds.), Learning from change: Issues and experiences in participatory monitoring and evaluation (pp. 95-108). Ottawa: International Development Research Centre. |
|
[15] | GRZ. Ministry of National Development Planning. 2016. 2015 Annual Progress Report for the Revised Sixth National Development Plan 2013-2016: People Centred Economic Growth and Development. Lusaka: Ministry of National Development Planning. |
|
[16] | Arora, D. 2013. Good Governance: A Study of the Concept in Indian Context–Origin of the Concept of Good Governance, Good Governance, 37(1): 1-16. |
|
[17] | Booth, D. 2005. Missing links in the politics of development: Learning from the PRSP experiment, ODI Working Paper No. 256. Overseas Development Institute, London. |
|
[18] | Brousselle, A. & Champagne, F. 2011. Program theory evaluation: Logic analysis. Evaluation and Program Planning, 34(1): 69-78. |
|
[19] | Castro, M. F. 2009. Insider Insights: Building a Results-Based Management and Evaluation System in Colombia. ECD Working Paper 18, The World Bank, Washington, D.C. |
|
[20] | Castro, M.F., Lopez-Acevado, G.,Busjeet, G.B. & Ardonez, X.F. 2009. Mexico's M&E System: Scaling up from the sectoral to the National Level. Evaluation Capacity Development. IEG. The Word Bank, Washington, D.C. |
|
[21] | Chabane, C. 2013. The Role of Monitoring and Evaluation in the Public Service, Republic of South Africa—The Presidency Department of Performance Monitoring and Evaluation. Pretoria, South Africa. |
|
[22] | Chambers, R. 1994. Participatory rural appraisal (PRA): Challenges, potentials, and paradigm. World Development, 22(1): 1437–1454. |
|
[23] | Eberlei, W. & Henn, H. 2003. Parliaments in Sub-Sahara Africa: Actors in poverty reduction? Eshborn: Deutsche Geschellschaft fu¨r Technische Zusammenarbeit (GTZ). |
|
[24] | El Baradei, L. Abdelhamid, D. & Walley, N. 2014. Institutionalising and streamlining development monitoring and evaluation in post-revolutionary Egypt: A readiness Primer. African Evaluation Journal, 2(1): 1-16. |
|
[25] | Engela, R. & Ajam, T. 2010. Evaluation Capacity Development: Implementing a Government-Wide Monitoring and Evaluation System in South Africa, Working Paper Series No. 21 No. 21. OED, The World Bank, Washington, D.C. |
|
[26] | Gomez, R., Olivera, M. & Velasco, M. 2009. Implementing a Subnational Results-oriented Management and Budgeting System: Lessons from Medellin, Colombia. Evaluation Capacity Development. IEG. The World Bank, Washington, D.C. |
|
[27] | Görgens, M. & Kusek, J. 2009. Making Monitoring and Evaluation Systems Work: A Capacity Development Toolkit. IBRD World Bank, Washington DC. |
|
[28] | GRZ. Ministry of Finance and National Planning. 2002. Zambia poverty reduction strategy paper (2002-2004), March 2002. Lusaka: Ministry of Finance and National Planning. |
|
[29] | GRZ. Ministry of Finance and National Planning. 2009. Mid-Term Review of the Fifth National Development Plan 2006-2010: Broad based wealth and job creation through citizenry participation and technological advancement. Lusaka: Ministry of Finance and National Planning. |
|
[30] | Adato, M. 2011. Combining Quantitative and Qualitative methods for Program Monitoring and Evaluation: Why are mixed method designs best? Prem Notes. Special series on the Nuts and Bolts of M&E systems. The World Bank, Washington, D.C. |
|
[31] | GRZ. Ministry of Finance and National Planning. 2014. National Planning and Budgeting Policy: Responsive, transparent, accountable and results-oriented Development Planning and Budgeting processes. Lusaka: Ministry of Finance and National Planning. |
|
[32] | GRZ. Ministry of National Development Planning. National Monitoring and Evaluation Policy (2019-2023): Results-oriented, evidence-based, integrated and well-coordinated Government-wide Monitoring and Evaluation System for improved development results. Lusaka: Ministry of Finance and National Planning, 2019. |
|
[33] | Kusek, J.Z., Rist, R.C. & White, E.M. 2004. How will we know Millennium Development Results when we see them? Building a Results-Based Monitoring and Evaluation System to Give us the Answer. The World Bank, Washington, D.C. |
|
[34] | GRZ. Ministry of Finance and National Planning (MOF–Zambia). 2013. Report on the Performance of the Sector Advisory Groups (SAGs), Lusaka: Ministry of Finance and National Planning. |
|
[35] | Ahem, M., Beard, V.A., Gueorguieva, A.I. & Sri Handini, R. 2012. Using M&E to support Performance Based Planning and Budgeting in Indonesia. Prem Notes, Special series on the Nuts and Bolts of M&E systems. The World Bank, Washington, D.C. |
|
[36] | Hickey, S. & Mohan, G. 2008. The Politics of Establishing Pro Poor Accountability: What can Poverty Reduction Strategies Achieve? Review of International Political Economy, 15(2): 234-258. |
|
[37] | Holvoet, N., Gildemyn, M. & Inberg, L. 2012. Taking Stock of Monitoring and Evaluation Arrangements in the Context of Poverty Reduction Strategy Papers: Evidence from 20 Aid-Dependent Countries in Sub-Saharan Africa. Development Policy Review, 30(6): 749-772. |
|
[38] | Holvoet, N., Inberg, L. & Sekirime, S. 2013. Institutional analysis of monitoring and evaluation systems: Comparing M&E systems in Uganda's health and education sectors. Working Paprer, Institute of Development Policy and Management, University of Antwerp. |
|
[39] | Zambia Monitoring and Evaluation Association. National Evaluation Advocacy and Strategy–2018-2021. Lusaka, 2018. |
|
[40] | Holvoet, N. & Renard, R. 2005. Putting the New Aid Paradigm to Work, Challenges for Monitoring and Evaluation, Discussion Paper No. 2. Institute of Development Policy and Management, University of Antwerp, Antwerp. |
|
[41] | Holvoet, N. & Rombouts, H. 2008. The challenge of monitoring and evaluation under the new aid modalities: Experiences from Rwanda. Journal of Modern African Studies, 46(4): 577-602. |
|
[42] | Holvoet, N. & Rombouts, H. 2008. The Denial of Politics in PRSP’s Monitoring and Evaluation: Experiences from Rwanda, Discussion Paper. Institute of Development Policy and Management, University of Antwerp, Antwerp. |
|
[43] | GRZ. Ministry of Finance and National Planning. 2010. Sixth National Development Plan 2011-2015: Sustained Economic Growth and Poverty Reduction. Lusaka: Ministry of Finance and National Planning. |
|
[44] | Hwang, H. 2014. Building Monitoring and Evaluation Capacity in young systems: The experiences of Rwanda, Vietnam and Yemen. The World Bank, Washington, D.C. |
|
[45] | Kanyamuna, V. 2013. Sector Monitoring and Evaluation Systems in the context of Poverty Reduction Strategies: A comparative case study of Zambia’s Health and Agriculture sectors. MSc-dissertation, University of Antwerp, Antwerp, Belgium. |
|
[46] | Kanyamuna, V., Mubita, A., Ng’andu, E., Mizinga, C. & Mwale, A. 2018. An Assessment of the Demand-Side of the Monitoring and Evaluation System of the Health Sector in Zambia. World Journal of Social Sciences and Humanities, 4(2): 75-86. |
|
[47] | Mubita, A., Mulonda, M., Libati, M., Mwale, N. & Kanyamuna, V. Urban Informality and Small Scale Enterprise (SME) Development in Zambia: An Exploration of Theory and Practice, Journal of Behavioural Economics, Finance, Entrepreneurship, Accounting and Transport, 2017. 5(1): p.19-29. |
|
[48] | Kanyamuna, V., Mulonda, M. & Mulele, C.S. 2019. Monitoring and Evaluation Legislation in Zambia–Gap Analysis. International Journal of Humanities, Art and Social Studies, 4(1): 15-25. |
|
[49] | GRZ. Ministry of Finance and National Planning. 2011. Fifth National Development Plan 2010 Annual Progress Review: Broad Based Wealth and Job Creation through Citizenry Participation and Technological Advancement. Lusaka: Ministry of Finance and National Planning. |
|
[50] | Kusek, J. Z. & Rist, R. C. 2004. Ten Steps to a Results-Based Monitoring and Evaluation Systems. A Handbook for Development Practitioners. The World Bank. Washington D.C. |
|
[51] | Laguna, M. 2011. Chile's Monitoring and Evaluation System (1994-2010). Prem Notes, Special series on the Nuts and Bolts of M&E systems. The World Bank, Washington, D.C. |
|
[52] | Lopez-Acevedo, G., Rivera, K., Rivera, L. 2010. Challenges in Monitoring and Evaluation: An Opportunity To Institutionalize M&E Systems. Fifth Conference of the Latin America and the Caribbean Monitoring and Evaluation (M&E) Network. |
|
[53] | Mupeta, S., Muleya, G., Kanyamuna, V., & Simui, F. (2020). Imperial Districts Civic Entrepreneurship: The Implementation of Civic Innovations in the Governance of the University of Zambia. Advances in Social Sciences Research Journal, 7(7) 674-685. |
|
[54] | Lopez-Acevedo, G., Krause, P. & Mackay, K. (Eds.). 2012. Building Better Policies. Washington, D.C. The World Bank. |
|
[55] | Mackay, K. 1999. Evaluation Capacity Development: A Diagnostic Guide and Action Framework, ECD Working Paper Series No. 6. The World Bank, Washington, D.C. |
|
[56] | Mackay, K. 2007. How to Build M&E Systems to Support Better Government. The International Bank for Reconstruction and Development and World Bank. The World Bank, Washington D.C. |
|
[57] | Bamberger, M. 2006. Evaluation Capacity Building, In: Segone and Ocampo (Ed.), Creating and Developing Evaluation Organizations) – Lessons learned from Africa, Americas, Asia, Australasia and Europe. |
|
[58] | GRZ. Ministry of Finance and National Planning. 2014. Report of the Final Evaluation of the Fifth National Development Plan 2006-2010. Lusaka: Ministry of Finance and National Planning. |
|
[59] | Bedi, T., Coudouel, A., Cox, M., Goldstein, M. & Thornton, N. 2006. Beyond the numbers : Understanding the institutions for monitoring poverty reduction strategies. The World Bank. Washington, D.C. |
|
[60] | Mackay, K. 2010. Conceptual Framework for Monitoring and Evaluation. The Nuts & Bolts of M&E Systems—The World Bank, 1, 8. |
|
[61] | Mackay, K. 2011. The Australian Government’s Performance Framework, ECD Working Paper No. 25. The World Bank, Washington, D.C. |
|
[62] | Mackay, K. 2006. Institutionalizing of Monitoring and Evaluation Systems to Improve Public Sector Management, ECD Working Paper Series No. 15. IEG World Bank, Washington D.C. |
|
[63] | GRZ. Ministry of Finance and National Planning. 2014. Revised Sixth National Development Plan 2013-2016: People Centred Economic Growth and Development – Volume I. Lusaka: Ministry of Finance and National Planning. |
|
[64] | Mark, M. M. 2008. Building a better evidence base for evaluation theory: Beyond general calls to a framework of types of research on evaluation. In N. Smith & P. R. Brandon (Eds.), Fundamental issues in evaluation (pp. 111-134). New York: Guilford. |
|
[65] | Booth, D. & Lucas, H. 2002. Good Practice in the Development of PRSP Indicators and Monitoring Systems, ODI Working Paper 172. Overseas Development Institute, London. |
|
[66] | May, E., Shand, D., Mackay, K., Rojas, F. & Saavedra, J. (Eds.). 2006. Towards the Institutionalization of Monitoring and Evaluation Systems in Latin America and the Caribbean: Proceedings of a World Bank Conference. The World Bank, Washington D.C. |
|
[67] | Holvoet, N. & Renard, R. Putting the New Aid Paradigm to Work, Challenges for Monitoring and Evaluation, Discussion Paper No. 2. Institute of Development Policy and Management, University of Antwerp, Antwerp, 2005. |
|
[68] | Mehrotra, S. 2013. The Government Monitoring and Evaluation System in India: A Work in Progress, ECD Working Paper series 28. IEG, The World Bank, Washington, D.C. |
|
[69] | Kanyamuna, V., Phiri, M., Kanenga, H. & Mulonda, M. (2020). “Role of Actors Outside Government in Strengthening the Country Monitoring and Evaluation System in Zambia.” World Journal of Social Sciences and Humanities, vol. 6, no. 1: 22-29. |
|
[70] | Kusek, J.Z. 2011. Assessing Country Readiness for Results-Based Monitoring and Evaluation to support Results Informed Budgeting. The World Bank, Washington, D.C. |
|
[71] | Kanyamuna, V., Mumba, M.H., Mkandawire, A., Munalula, M. & Kalonje, V. (2021). “Opportunities and Challenges in Using Information from Zambia’s Government Monitoring and Evaluation System”. World Journal of Social Sciences and Humanities, vol. 7, no. 1: 23-33. |
|
[72] | Morra Imas, L. G. & Rist, R. C. 2009. The Road to Results: Designing and Conducting Effective Development Evaluations. The World Bank, Washington, D.C. |
|
[73] | Mosse, R. & Sontheimer, L. 1996. Performance Monitoring Indicators Handbook. World Bank Technical Paper No. 334. The World Bank, Washington, D.C. |
|
[74] | Mulonda, M., Kanyamuna, V. & Kanenga, H. 2018. State–Civil Society relationship in Zambia, International Journal of Humanities, Art and Social Studies, 3(4): 17-26. |
|
[75] | Bamberger, M. 2008. Enhancing the utilisation of evaluations for evidence-based policy- making. In M. Segone (Ed.). Bridging the Gap. Switzerland: UNICEF. |
|
[76] | Naidoo, I. 2011. The role of monitoring and evaluation in promoting good governance in South Africa : A case study of the Department of Social Development: PhD–Thesis submitted to the Graduate School of Public & Development Management in fulfilment of the requirements for doctorate degree. University of Witwatersrand. |
|
[77] | Kanyamuna, V., Mulonda, M. & Mulele, C.S. Monitoring and Evaluation Legislation in Zambia–Gap Analysis. International Journal of Humanities, Art and Social Studies, 2019. 4(1): 15-25. |
|
[78] | Nelson, C. 2016. Exploring Monitoring and Evaluation within a Good Governance perspective: A case study of Stellenbosch Municipality, March, 2016. |
|
[79] | OECD/DAC. 2005. Aid Effectiveness 2005-10 : Progress in Implementing the Paris Declaration. Paris.OECD Publications. |
|
[80] | Porter, S. & Goldman, I. 2013. A Growing Demand for Monitoring and Evaluation in Africa. African Evaluation Journal.1(1): 1-9. |
|
[81] | Porter, S. 2012. ‘The Growing Demand for Monitoring and Evaluation in Africa’, in Centre for Learning on Evaluation and Results CLEAR (ed.), African Monitoring and Evaluation Systems: Exploratory Case Studies (Johannesburg: University of the Witwatersrand). |
|
[82] | Raimondo, E. 2016. What Difference Does Good Monitoring and Evaluation Make to World Bank Project Performance? Policy Research Working Paper. IEG. The World Bank, Washington, D.C. |
|
[83] | Kanyamuna, V., Mubita, A., Ng’andu, E., Mizinga, C. & Mwale, A. 2018. An Assessment of the Demand-Side of the Monitoring and Evaluation System of the Health Sector in Zambia. World Journal of Social Sciences and Humanities, 2018. 4(2): p. 75-86. |
|
[84] | Schiavo-Campo, S. 2005. Evaluation Capacity Development—Building Country Capacity for Monitoring and Evaluation in the Public Sector: Selected Lessons of International Experience, Working Paper Series No. 13, OED, World Bank, Washington, D.C. |
|
[85] | Segone, M. (Ed), 2010. From policies to results. Developing capacities for country monitoring and evaluation systems. UNICEF, DevInfo, IDEAS, ILO, IOCE, UNDP, UNIFEM, WFP and World Bank. |
|
[86] | Shepherd, G. 2011. Conducting Diagnosis of M&E systems and Capacities. Prem Notes, Special series on the Nuts and Bolts of M&E systems. The World Bank, Washington, D.C. |
|
[87] | Smith, P. C., Nutley, S. M., Davies, H. T. O., Nutley, S. M. & Smith, P. C. 2009. What works?: evidence-based policy and practice in public services. What works?: evidence-based policy and practice in public services. Bristol: The Policy Press. |
|
[88] | Kanyamuna, V. Sector Monitoring and Evaluation Systems in the context of Poverty Reduction Strategies: A comparative case study of Zambia’s Health and Agriculture sectors. MSc–dissertation, University of Antwerp, Antwerp, Belgium, 2013. |
|
[89] | Srivastava, J., Kampen, J., Baker, G., Byerlee, D. & Sehya, M. 2003. Good practices in Monitoring and Evaluation and Management Information Systems for competitive Grant Progams in ECA Countries. The World Bank, Washington, D.C. |
|
[90] | Treasury Board of Canada Secretariat. 2012. Theory-Based Approaches to Evaluation: Concepts and Practices. |
|
[91] | Trucano, M. (ed.). 2005. Monitoring and Evaluation of ICT in Education projects: A Handbook for Developing Countries. The World Bank, Washington, D.C. |
|
[92] | UNAIDS. 2009. 12 Components of Monitoring and Evaluation System Assessment: Guidelines to Support Preparation, Implementation and Follow-up Activities. Geneva. |
|
[93] | UNDP. 2009a. Handbook on Planning, Monitoring and Evaluating for Development Results. United Nations Development Programme, New York. |
|
[94] | Kanyamuna, V., Kotzé, D. A. & Phiri, M. “Monitoring and Evaluation Systems: The Missing Strand in the African Transformational Development Agenda.” World Journal of Social Sciences and Humanities, 2019. 5(3): 160-175. |
|
[95] | GRZ. Ministry of National Development Planning. 2017. Seventh National Development Plan (7NDP 2017-2021), Accelerating Development Efforts towards Vision 2030 without Leaving Anyone Behind (Vol. 1). Lusaka: Ministry of National Development Planning. |
|
[96] | White, H. 2009. Theory-Based Impact Evaluation: Principles and Practice (Impact Evaluation Working Paper 3). International Initiative for Impact Evaluation, Working Paper 3. New Delhi. |
|
[97] | Wong, C. 2012. Toward Building Performance – Oriented Management in China: The critical role of Monitoring and Evaluation and the Long road Ahead (ECD Working Paper No. 27). The World Bank, Washington D.C. |
|
[98] | Kanyamuna, V., Katowa, T., Mubita, A., Kanenga, H., Simui, F., & Kotze, D. A. (2020). Analysis of Structural and Organisational Arrangements of Monitoring And Evaluation Status For The Public Sector In Zambia. Advances in Social Sciences Research Journal, 7(6) 504-527. |
|
[99] | World Bank. 2004. Assessing country readiness for results-based monitoring and evaluation systems. Prem Notes, Special series on the Nuts and Bolts of M&E systems. The World Bank, Washington, D.C. |
|
[100] | World Bank. 2007. A Diagnosis of Colombia's National M&E System, SINERGIA. Evaluation Capacity Development. Working Paper Series No. 17. IEG. The World Bank, Washington, D.C. |
|
[101] | World Bank. 2009. Institutionalising Impact Evaluation within the framework of a Monitoring and Evaluation System. IEG. The World Bank, Washington, D.C. |
|
[102] | Segone, M. 2008. “Evidence-based policy-making and the role of monitoring and evaluation within the new aid environment”. In: Bridging the gap. The role of monitoring and evaluation in evidence-based policy-making. UNICEF, DevInfo, IDEAS, MICS, The World Bank. |
|
[103] | World Bank. 2012. Designing a Results Framework for achieving Results: A How-To-Guide. IEG, Washington, DC. |
|
[104] | Mulonda, M., Kanyamuna, V. & Kanenga, H. State–Civil Society relationship in Zambia, International Journal of Humanities, Art and Social Studies, 2018. 3(4): p. 17-26. |
|
[105] | World Bank. 2012. Improving the Quality of Public Expenditure through the use of Performance Information in Mexico. IEG, The World Bank, Washington, D.C. |
|
[106] | World Health Organisation. 2012. Monitoring and Evaluation Indicators for Integrated Vector Management. WHO, Geneva. |
|
[107] | Wotela, K. 2017. A proposed Monitoring and Evaluation Curriculum based on a model that institutionalises monitoring and evaluation. African Evaluation Journal, 5(1): 1-8. |
|
[108] | Mackay, K. 2008. Helping countries build government monitoring and evaluation system. World Bank contribution to evidence-based policy making. In M. Segone (Ed.). Bridging the Gap. Switzerland: UNICEF. |
|
[109] | Lopez-Acevedo, G., Krause, P. & Mackay, K. (Eds.). 2012. Building Better Policies: The Nuts and Bolts of Monitoring and Evaluation Systems. The World Bank, Washington, D.C. |
|
[110] | Zaltsman, A. 2006. Experience with Institutionalizing Monitoring and Evaluation Systems In Five Latin American Countries: Argentina, Chile, Colombia, Costa Rica and Uruguay (ECD Working Paper 16 No. 16). Washington, D.C. The World Bank. |
|
[111] | Kanyamuna, V., Mubita, A., & Kotzé, D. A. Is the policy environment for Zambia supportive of a thriving whole-of-government monitoring and evaluation system? Advances in Social Sciences Research Journal, 2020. 7(1) 542-554. |
|
[112] | Zambia Monitoring and Evaluation Association. 2018. National Evaluation Advocacy and Strategy–2018-2021. Lusaka. |
|
[113] | Kusek, J. Z. & Rist, R. C. 2002. Building Results-Based Monitoring and Evaluation Systems: Assessing Developing Countries Readiness. Zeitschrift Für Evaluation, 1 (1): 151-158. |
|
[114] | Kanyamuna, V. Analysis of Zambia’s Whole-of-Government Monitoring and Evaluation System in the context of National Development Plans. Doctorate Thesis. University of South Africa, 2019. |
|
[115] | Segone, M. (Ed.). 2009. Country-led Monitoring and Evaluation Systems: Better evidence, better policies, better development results. UNICEF, Geneva. |
|
[116] | GRZ. Ministry of National Development Planning. 2017a. 2016 Annual Progress Report for the Revised Sixth National Development Plan 2013-2016: People Centred Economic Growth and Development. Lusaka: Ministry of National Development Planning. |
|