| [1] | Harper, A.P, Jaguar’s approach to dimensional control in product development, colloquium on dimensional variation (Digest No 1997/346) 1997. |
| |
| [2] | Cleverly, D.J, Olifent, A.M.D, Rover’s approach to dimensional variation, colloquium on dimensional variation (Digest No 1997/346) 1997. |
| |
| [3] | McFadden, C.D, Application of system design tools to integrate product development process, MSc thesis, University of South Carolina, 2005. |
| |
| [4] | Zheng, L.Y, McMahon, C.A, Li1, L, Ding L, Jamshidi, J, Key characteristics management in product lifecycle management: a survey of methodologies and practices, Proc. IMechE Vol. 222 Part B: 2008. |
| |
| [5] | Day, J, 787 Dimensional management, Boeing Corporation, 2005, available from http://www.lvmc.org.uk., accessed June 2013. |
| |
| [6] | Astles, S, Dimension management, the reasons for change, AirbusUk, 2005, available from http://www.3dcs.com/downloads/airbus.pdf, accessed June 2013. |
| |
| [7] | Robert, E.B, Best practice: F-22 variability reduction, Lockheed Martin, 2005, available from http://www.bmpcoe.org/bestpractices/internal/lmtas/lmtas_18.html, accessed June 2013. |
| |
| [8] | Pritchett, J, losing the loop of the digital thread”, Lockheed Martin, 2005, available from http://web.mit.edu/lmp/Presentations/Pritchett-Lockheed.pdf, accessed June 2013. |
| |
| [9] | Spicknall, M.H, Kumar, R, and Huang, T.D, Dimensional management in shipbuilding: a case study fromthe Northrup Grumman Ship Systems Lightweight Structures Project, J. Ship Prod., 2005, 21(4), 209-218. |
| |
| [10] | Jeffreys, D, Leaney, P.G, Dimensional control as an integral part of next-generation aircraft development, Proc. Instn. Mech. Engrs, Part B: J. Engineering Manufacture, 2000, 214(B9), 831-835. |
| |
| [11] | Craig, M, Variation by design, Mechanical Engineering, 110, pp52-54, November 1988. |
| |
| [12] | Craig, M, Dimensional management versus tolerance assignment, Assembly Automation, Volume 16, Number 2, 1996, 12-16. |
| |
| [13] | Craig, M, Dimensional management: a necessary process to meet corporate goals for global competition, colloquium on dimensional variation (Digest No 1997/346) 1997. |
| |
| [14] | Ceglarek, D, Shi, J, Dimensional variation reduction for automotive body assembly, Mfg Rev., 1995, 8(2), 139-154. |
| |
| [15] | Loose, J.P, Zhou, O, Zhou, S, Ceglarek, D, Integrating GD&T into dimensional variation models for multistage machining processes, International Journal of Production Research, Vol. 48, No. 11, 1 June 2010, 3129-3149. |
| |
| [16] | Sleath, D.M, Leaney, P.G, Control of dimensional variation and integrated product development, colloquium on dimensional variation (Digest No 1997/346) 1997. |
| |
| [17] | Booker, J.D, Swift, K.G, Brown, N.J, Designing for assembly quality: strategies, guidelines and techniques, Journal of Engineering Design, 16:3, 279-295. |
| |
| [18] | Dresner, T, Barkan, P, A review and classification of variable valve timing mechanisms, Technical paper 890674, Society of Automotive Engineers congress and exposition, Detroit, MI, USA , 27 Feb-3 Mar 1989. |
| |
| [19] | Li, L, Tao, J, Wang, Y, Su, Y, Xiao, M, Effects of intake valve closing timing on gasoline engine performance and emissions, SAE Technical Paper 2001-01-3564, 2001. |
| |
| [20] | Siewert, R.M, How individual valve timing events affect exhaust emissions, SAE Technical Paper 710609, 1971. |
| |
| [21] | Takemura, S, Aoyama, S, Sugiyama, T, Nohara, T, Moteki, K, Nakamura, M, Hara, S,A study of a continuous variable valve event and lift (VEL) system, SAE Technical Paper 2001-01-0243, 2001. |
| |
| [22] | Wong, P.K, Tam, L. M, Li, K, Modelling and simulation of a dual mode electro hydraulic fully variable valve train for four stroke engines, International Journal of Automotive Technology: Vol 9, No5, pp 509-521, 2008. |
| |
| [23] | Sleath, L.C, Leaney, P.G, The use of virtual fixtures, jigs and gauges in dimensional variation analysis models, Loughborough University, 2013. |
| |