American Journal of Civil Engineering and Architecture. 2023, 11(1), 10-16
DOI: 10.12691/ajcea-11-1-2
Open AccessArticle
Destin Gemetone Etou1, , Christian Tathy1 and Westinevy Benarez Ndzessou1
1Higher Normal School (ENS), University Marien Ngouabi BP 69 - Brazzaville CONGO
Pub. Date: March 10, 2023
Cite this paper:
Destin Gemetone Etou, Christian Tathy and Westinevy Benarez Ndzessou. The Program Evaluation Review Technique - Improved Sub-Structure Chaining Diagram (PERT-ISSCD): A New Tool for Project Planning in Developing Countries (DCs). American Journal of Civil Engineering and Architecture. 2023; 11(1):10-16. doi: 10.12691/ajcea-11-1-2
Abstract
The socio-economic environment in developing countries has often posed problems in completing projects on time. Additional costs are often incurred. The results of surveys carried out in construction companies in the Republic of Congo confirm the existence of shortcomings in the management of construction projects in developing countries. We propose a scheduling approach that can be used to plan projects for which effective financing is not assured before work begins, or for which management would be difficult with traditional scheduling methods (PERT and GANTT) because of financial difficulties. This is the PERT-ISSCD (Programme Evaluation and Review Technique - Improuved Sub-Structure Chaining Diagram), which is the combination of PERT (programme evaluation and review technique) and ISSCD (Improuved Sub-Structure Chaining Diagram). The application of PERT-ISSCD to an R+1 construction project with uncertain financing resulted in a completion time of 128 weeks and 152 days in the context of resource mobilisation based on the client's monthly savings.Keywords:
planning duration mobilisation resources project project owner scheduling sub-project sub-budget critical path programming path
This work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit
http://creativecommons.org/licenses/by/4.0/
Figures
References:
| [1] | Lachambre M. Plaidoyer pour un NEPAD " Logement " en Afrique, Villes en Développement, Bulletin de la Coopération française pour le développement urbain, l'habitat et l'aménagement spatial, N° 56, June 2002, p. 6-7. |
| |
| [2] | Delis Philippe, Girard Christian, De Maximy René et al. Economie de la construction à Kinshasa, Paris: L'Harmattan, 1988, 125 p. |
| |
| [3] | Blondin P., Mouna Kigue D., Vothanh T. Typologie et coût de construction à Douala, Centre d'Edition et de Production pour l'Enseignement et la Recherche, 1988, Yaoundé, Cameroon. |
| |
| [4] | Pettang C. Éléments d'optimisation de la production d'un habitat urbain au Cameroun, Presses Universitaires de Yaoundé, 1999, 183 p. |
| |
| [5] | Destin Gemetone Etou, Christian Tathy, Sorel Gaël Dzaba-Dzoualou, Rodrigue Armel Patrick Okemba, Narcisse Malanda and Paul Louzolo-Kimbembe. The dysfunctions of construction project management in developing countries: the case of the Republic of Congo. American Journal of Engineering Research (AJER), Vol-10 (12),-issue-12-2021, p.202-207. |
| |
| [6] | Destin Gemetone Etou, Christian Tathy, Sorel Gaël Dzaba-Dzoualou, Rodrigue Armel Patrick Okemba, Narcisse Malanda and Paul Louzolo-Kimbembe. The Improved Sub-structure Chaining Diagram (ISSCD): a tool for project management in the informal and semi-informal construction sectors of Developing Countries (DC). Journal of Scientific and Engineering Research (JSAER), vol-8-iss-12-2021, pp. 172-180. |
| |