| [1] | Söderberg, R. Lindkvist, L. Carlson, J.S, Managing physical dependencies through location system design, Journal of Engineering Design, 17, 4, 325-346, 2006. |
| |
| [2] | Harper, A.P,Jaguar’s approach to dimensional control in product development, colloquium on dimensional variation (Digest No 1997/346) 1997. |
| |
| [3] | Cleverly, D.J,Olifent, A.M.D, Rover’s approach to dimensional variation, colloquium on dimensional variation (Digest No 1997/346) 1997. |
| |
| [4] | Held D.O, Assembly variation analysis: Chrysler’s tool for upfront dimensional management, Society of Manufacturing Engineeers, TE920272, 1992. |
| |
| [5] | Staif J, Dimensional management process applied to automotive door systems, Society of Automotive Engineers TP982305, 1998. |
| |
| [6] | Rizvi A, Dimensional management – setting static and dynamic dimensional goals concurrently, Society of Automotive Engineers TP 2002-01-2004, 2002. |
| |
| [7] | Chery Automobile Co. Ltd, Quality drives Chinese automaker; on route to creating a world famous name, Siemens, available from http://www.plm.automation.siemens.com/en_gb/about_us/sucess/case_study.cfm?Componet=131067&ComponetTemplate= 1481, accessed June 2013. |
| |
| [8] | Kim Y.S, Jang D.Y, Optimisation of geometric dimension & tolerance parameters of front suspension systems for vehicle pulls improvement, Transactions of the Korean Society of Mechanical Engineers, Vol 33, Issue 9, 2009, pp903-912. |
| |
| [9] | Queckenberg A., Rollout of a JT process chain, Daimler AG, ProSTEPiViP Symposium, Berlin, 2009. |
| |
| [10] | Gomer P, Tolerance Analysis Model Management Using StackManager, Chrysler Group LLC, Sigmetrix U2U conference, DallasUSA, October 25-26 2012. |
| |
| [11] | Balachandran A,Crank Cam Timing Error Calculation – A CE Assembly Variation Analysis, Chrysler Group LLC, Sigmetrix U2U conference, DallasUSA, October 25-26 2012. |
| |
| [12] | Shuxin G, Tolerance design in powertrain product creation process, Journal of ADVAnced Manufacturing Systems, 05, 167 2006. |
| |
| [13] | McFadden, C.D, Application of system design tools to integrate product development process, MSc thesis, University of South Carolina, 2005. |
| |
| [14] | Zheng, L.Y, McMahon, C.A, Li1, L, Ding L, Jamshidi, J, Key characteristics management in product lifecycle management: a survey of methodologies and practices, Proc. IMechE Vol. 222 Part B: 2008. |
| |
| [15] | Day, J, 787 Dimensional management, Boeing Corporation, 2005, available from http: //www.lvmc.org.uk., accessed June 2013. |
| |
| [16] | Astles, S, Dimension management, the reasons for change,AirbusUK, 2005, available from http://www.3dcs.com/downloads/airbus.pdf, accessed June 2013. |
| |
| [17] | Robert, E.B, Best practice: F-22 variability reduction, Lockheed Martin,2005, available fromhttp://www.bmpcoe.org/bestpractices/internal/lmtas/lmtas_18.html, accessed June 2013. |
| |
| [18] | Pritchett, J, Losing the loop of the digital thread”, Lockheed Martin, 2005, available fromhttp://web.mit.edu/lmp/Presentations/Pritchett-Lockheed.pdf, accessed June 2013. |
| |
| [19] | Spicknall, M.H, Kumar, R, and Huang, T.D, Dimensional management in shipbuilding: a case study fromthe Northrup Grumman Ship Systems LightweightStructures Project,J. Ship Prod., 2005, 21(4), 209-218. |
| |
| [20] | Jeffreys, D,Leaney, P.G, Dimensional control as an integral part of next-generation aircraft development, Proc. Instn. Mech. Engrs, Part B: J. Engineering Manufacture, 2000, 214(B9), 831-835. |
| |
| [21] | Craig, M, Variation by design, Mechanical Engineering, 110, pp52-54, November 1988. |
| |
| [22] | Craig, M, Dimensional management versus tolerance assignment, Assembly Automation,Volume 16, Number 2, 1996, 12-16. |
| |
| [23] | Craig, M, Dimensional management: a necessary process to meet corporate goals for global competition, colloquium on dimensional variation (Digest No 1997/346) 1997. |
| |
| [24] | Ceglarek, D,Shi, J, Dimensional variation reduction for automotive body assembly,Mfg Rev., 1995, 8(2), 139-154. |
| |
| [25] | Loose,J.P, Zhou, O, Zhou, S,Ceglarek, D, Integrating GD&T into dimensional variation models for multistage machining processes,International Journal of Production Research, Vol. 48, No. 11, 1 June 2010, 3129-3149. |
| |
| [26] | Sleath, D.M, Leaney, P.G, Control of dimensional variation and integrated product development, colloquium on dimensional variation (Digest No 1997/346) 1997. |
| |
| [27] | Booker, J.D, Swift, K.G, Brown, N.J, Designing for assembly quality: strategies, guidelines and techniques, Journal of Engineering Design, 16:3, 279-295. |
| |
| [28] | Bourjault, A, Contribution á uneApproacheMéthodologique de L’ Assemblage Automatisé: Elaborationautomatique des sequences Opératoires, Docteur des Sciences Physiques Thesis, 1984,Université de Fanche – Comté, Besancon, France |
| |
| [29] | Baldwin, D.F,Abell, T.E., Lui, M.C, M. De Fazio, T.L, Whitney, D.E, An integrated computer aid for generating and evaluating assembly sequences for mechanicalproducts, E Transactions on Robotics and Automation, 1991,Vol 7, 1, pp 78-94. |
| |
| [30] | Dini, G. Santochi, M. (1992) Automated sequencing and subassembly detection in assembly planning. Annals of the CIRP 41, 1, pp 1-4. |
| |
| [31] | Ou, L. Xu, X. (2013) Relationship matrix based automatic assembly sequence generation from a CAD model. Computer-Aided Design, 45 (2013), pp1053-1067. |
| |
| [32] | Xu, L.D. Wang, C. Bi, Z. Yu,J. (2012) AutoAssem: An automated assembly planning system for complex products. IEEE Transactions on Industrial Informatics. 8, 3, August 2012, pp669-678. |
| |
| [33] | ASME Y14.5-2009, Dimensioning and Tolerancing; Engineering Drawing and related documentation practices, American Society of Mechanical Engineers. |
| |
| [34] | Krulikowski, A, Fundamentals of Geometric Dimensioning and Tolerancing, second edition, Delmar Cenage Learning, 2007, Clifton Park, New York, USA. |
| |
| [35] | Whitney, D.E, Mantripragada, R, Adams, D, Rhee, S.J, Designing Assemblies, Research in Engineering Design 1999, 1, 229-253. |
| |
| [36] | Adams, J.D, Whitney, D.E, Application of screw theory to constraint analysis of mechanical assemblies joined by features, Journal of Mechanical Design, 123, 2001, March, 26-32. |
| |
| [37] | Gerbino, S,Arrichiello, F, How to investigate constraints and motions in assemblies by screw theory.Proceedings of the 4thCIRP International Conference on Intelligent Computation in Manufacturing Engineering (ICME), pp331-336,Sorrento, Italy, 30 June-2 July 2004. |
| |
| [38] | Whitney, D.E, Connectivity limits of mechanical assemblies modelled as networks.MIT, Engineering Systems Division, working paper series, ESD-WP-004-07, 2004. |
| |
| [39] | Whitney, D.E, Mechanical Assemblies; Their design, manufacture and role in product development,Oxford University Press, 2004,pp 86-101. |
| |
| [40] | Whitney, D.E, The role of key characteristics in the design of mechanical assemblies, Assembly Automation, 2006, 26(4), 315-322. |
| |
| [41] | Mathieu, L,Marguet, B, Integrated design method to improve producibility based on product keycharacteristics and assembly sequences, CIRP Annals, Manufacturing technology, 50, 1, 2001, pp 85-88. |
| |
| [42] | Ballu, A. Mathieu, L,Choice of functional specifications using graphs within the framework of education, 6thCIRP International Seminar on , Enschede, 1999, pp 197-206. |
| |
| [43] | Whitney, D.E, Mechanical Assemblies; Their design, manufacture and role in product development. OxfordUniversity Press, Oxford, 2004, pp 53-55. |
| |
| [44] | Chase, K.W, Parkinson A.R,A survey of research in the application of tolerance analysis to the design ofmechanical assemblies, Research in Engineering Design, 1991, 3:23-37. |
| |
| [45] | Gao, J, Chase, K.W. Magleby, S P, Generalized 3-D tolerance analysis of mechanical assemblies with small kinematic adjustments, Transactions, 1998, 30,367-377. |
| |
| [46] | Sleath,L.C, Leaney,P.G, The use of a two stage dimensional variation analysis model to simulate the action of a hydraulic tappet adjustor in a car engine valve train system,Loughborough University, UK, 2013. |
| |