[1] | Nudurupati, S., T. Arshad, and T. Turner, Performance measurement in the construction industry: Anaction case investigating manufacturing methodologies. Computers in Industry, 2007. 58(7): p. 667-676. |
|
[2] | Christensen, C.M., Exploring the limits of the technology S-curve. Part I: component technologies. Production and operations management, 1992. 1(4): p. 334-357. |
|
[3] | Schueler, T.R., A current assessment of urban best management practices: Techniques for reducing non-point source pollution in the coastal zone. 1992: Metropolitan Washington Council of Governments. |
|
[4] | Ferdous, W., et al., New advancements, challenges and opportunities of multi-storey modular buildings–A state-of-the-art review. Engineering Structures, 2019. 183: p. 883-893. |
|
[5] | Sacks, R., C.M. Eastman, and G. Lee, Parametric 3D modeling in building construction with examples from precast concrete. Automation in construction, 2004. 13(3): p. 291-312. |
|
[6] | Hassanpour, M., Performance assessment of sewage treatment plant & sludge (Hyderabad, India) to make brick from released sludge. A Ph. D projec t submitted to Osmania University, 2018. |
|
[7] | Mitchell, N., et al., The ITER magnets: Design and construction status. IEEE transactions on applied superconductivity, 2011. 22(3): p. 4200809-4200809. |
|
[8] | Hoek, E., Support for very weak rock associated with faults and shear zones, in Rock support and reinforcement practice in mining. 2018, Routledge. p. 19-32. |
|
[9] | Cheng, Z., Seismic performance of prefabricated bridge piers supported on pile foundations. 2019, Iowa State University. |
|
[10] | Rasmussen, K.J., Behaviour and modelling of connections in cold-formed steel single C-section portal frames. Thin-Walled Structures, 2019. 143: p. 106233. |
|
[11] | Gleick, P.H., Basic water requirements for human activities: meeting basic needs. Water international, 1996. 21(2): p. 83-92. |
|
[12] | Mao, C., et al., Cost analysis for sustainable off-site construction based on a multiple-case study in China. Habitat International, 2016. 57: p. 215-222. |
|
[13] | Gibb, A.G., Off-site fabrication: prefabrication, pre-assembly and modularisation. 1999: John Wiley & Sons. |
|
[14] | Fritz, F., Application of an automated kite system for ship propulsion and power generation, in Airborne wind energy. 2013, Springer. p. 359-372. |
|
[15] | Wolf, M.E. and M.S. Lam, A loop transformation theory and an algorithm to maximize parallelism. IEEE Transactions on Parallel & Distributed Systems, 1991. 2(04): p. 452-471. |
|
[16] | Zhenglin, L. and Z. Haibin, Research on Construction Technology for Prefabricated Stone Curtain Wall Base Keel. Sciences, 2020. 5(6): p. 133-148. |
|
[17] | Li, F. and X. Wang, Installation Technology and Deformation Control of a High-Level, Large-Span Steel Hoisting Structure, in ICTE 2011. 2011. p. 1415-1420. |
|
[18] | Hardin, B. and D. McCool, BIM and construction management: proven tools, methods, and workflows. 2015: John Wiley & Sons. |
|
[19] | Pawlyn. M.. Biomimicry in architecture. 2019: Routledge. |
|
[20] | Hurd. M.K. Formoork for concrete. 2005. American Concrete Institute. |
|
[21] | Straube. J.. K. Ueno. and C. Schumacher. Measure guideline: internalinsulabon of masonry walls. 2012. National Rene. |
|
[22] | Cao. D.. et al.. Pracb'ces and effecb'veness of but!ding informatton modelling in construction projects in China. Automation in construction. 2015. 48: p. 113-122. |
|