American Journal of Civil Engineering and Architecture
ISSN (Print): 2328-398X ISSN (Online): 2328-3998 Website: https://www.sciepub.com/journal/ajcea Editor-in-chief: Dr. Mohammad Arif Kamal
Open Access
Journal Browser
Go
American Journal of Civil Engineering and Architecture. 2022, 10(2), 65-73
DOI: 10.12691/ajcea-10-2-1
Open AccessArticle

The Technical Application of Industrial Pre-assembled Residential Building Typology

Francis Deng Clement1, Liu Qidong2, Zhou Xingwen3 and Luo Xiaojuan4,

1School of Architecture & Art Design, Southeast University Chengxian College and Architect of UB Shanghai Building

2CEO UB Shanghai Building Technology, UG Prefab Technology Development Shanghai Co.ltd ‘Shanghai, China

3Project Manager of UB Shanghai Building Technology, UG Prefab Technology Development Shanghai Co.ltd ‘Shanghai, China

4Human Resources Manager of UB Shanghai Building Technology, UG Prefab Technology Development Shanghai Co.ltd

Pub. Date: March 31, 2022

Cite this paper:
Francis Deng Clement, Liu Qidong, Zhou Xingwen and Luo Xiaojuan. The Technical Application of Industrial Pre-assembled Residential Building Typology. American Journal of Civil Engineering and Architecture. 2022; 10(2):65-73. doi: 10.12691/ajcea-10-2-1

Abstract

Regarding environmental preservation, the high-rise prefabricated home represents the trend of modernization for the national housing sector. Energy conservation strategy should be the ultimate objective of any growing country. The current state of the housing industry Modernization includes industrialized manufacture of residential prefabricated components, prefabricated component installation on the building site, and factory modernization. Advertisements promoting the advantages, acceptability, and quality of prefabricated components and construction on the construction site Management and organization, for example. (The use of prefabricated technology in industrialized residential constructions) primarily entails the manufacture of prefabricated components: enhancements to component construction drawings and structural design of a mould. The installation of prefabricated components mainly includes: confirmation of hoisting process, design of temporary support system and design of temporary supports Plan, construction site layout, type selection of large hoisting equipment, transportation of prefabricated components, etc.

Keywords:
industrialized residential prefabricated PC board

Creative CommonsThis work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/

References:

[1]  Nudurupati, S., T. Arshad, and T. Turner, Performance measurement in the construction industry: Anaction case investigating manufacturing methodologies. Computers in Industry, 2007. 58(7): p. 667-676.
 
[2]  Christensen, C.M., Exploring the limits of the technology S-curve. Part I: component technologies. Production and operations management, 1992. 1(4): p. 334-357.
 
[3]  Schueler, T.R., A current assessment of urban best management practices: Techniques for reducing non-point source pollution in the coastal zone. 1992: Metropolitan Washington Council of Governments.
 
[4]  Ferdous, W., et al., New advancements, challenges and opportunities of multi-storey modular buildings–A state-of-the-art review. Engineering Structures, 2019. 183: p. 883-893.
 
[5]  Sacks, R., C.M. Eastman, and G. Lee, Parametric 3D modeling in building construction with examples from precast concrete. Automation in construction, 2004. 13(3): p. 291-312.
 
[6]  Hassanpour, M., Performance assessment of sewage treatment plant & sludge (Hyderabad, India) to make brick from released sludge. A Ph. D projec t submitted to Osmania University, 2018.
 
[7]  Mitchell, N., et al., The ITER magnets: Design and construction status. IEEE transactions on applied superconductivity, 2011. 22(3): p. 4200809-4200809.
 
[8]  Hoek, E., Support for very weak rock associated with faults and shear zones, in Rock support and reinforcement practice in mining. 2018, Routledge. p. 19-32.
 
[9]  Cheng, Z., Seismic performance of prefabricated bridge piers supported on pile foundations. 2019, Iowa State University.
 
[10]  Rasmussen, K.J., Behaviour and modelling of connections in cold-formed steel single C-section portal frames. Thin-Walled Structures, 2019. 143: p. 106233.
 
[11]  Gleick, P.H., Basic water requirements for human activities: meeting basic needs. Water international, 1996. 21(2): p. 83-92.
 
[12]  Mao, C., et al., Cost analysis for sustainable off-site construction based on a multiple-case study in China. Habitat International, 2016. 57: p. 215-222.
 
[13]  Gibb, A.G., Off-site fabrication: prefabrication, pre-assembly and modularisation. 1999: John Wiley & Sons.
 
[14]  Fritz, F., Application of an automated kite system for ship propulsion and power generation, in Airborne wind energy. 2013, Springer. p. 359-372.
 
[15]  Wolf, M.E. and M.S. Lam, A loop transformation theory and an algorithm to maximize parallelism. IEEE Transactions on Parallel & Distributed Systems, 1991. 2(04): p. 452-471.
 
[16]  Zhenglin, L. and Z. Haibin, Research on Construction Technology for Prefabricated Stone Curtain Wall Base Keel. Sciences, 2020. 5(6): p. 133-148.
 
[17]  Li, F. and X. Wang, Installation Technology and Deformation Control of a High-Level, Large-Span Steel Hoisting Structure, in ICTE 2011. 2011. p. 1415-1420.
 
[18]  Hardin, B. and D. McCool, BIM and construction management: proven tools, methods, and workflows. 2015: John Wiley & Sons.
 
[19]  Pawlyn. M.. Biomimicry in architecture. 2019: Routledge.
 
[20]  Hurd. M.K. Formoork for concrete. 2005. American Concrete Institute.
 
[21]  Straube. J.. K. Ueno. and C. Schumacher. Measure guideline: internalinsulabon of masonry walls. 2012. National Rene.
 
[22]  Cao. D.. et al.. Pracb'ces and effecb'veness of but!ding informatton modelling in construction projects in China. Automation in construction. 2015. 48: p. 113-122.