| [1] | Thenbs (2014). "Tendering for Construction Projects". http://www.thenbs.com/topics/contractsLaw/articles/tenderingForConstructinProjects. Asp Last Access Dec. 7, 2014. |
| |
| [2] | Benetly, J.I.W. (1987). “Construction Tendering and Estimating”, London: E. & F.N. Spon. |
| |
| [3] | Smith, R. C. (1986). “Estimating and tendering for building work”, Longman: London |
| |
| [4] | Buchan, R.D., Fleming, F.W.E and Grant, F.E.K (2003). “Estimating for Builders and Surveyors”, 2nd ed., Elsevier, Oxford: Butterworth-Heinemann. |
| |
| [5] | Cook, A.E. (1991). “Construction tendering: theory and practice”, London: B.T. Batsford Ltd. |
| |
| [6] | Laryea, S. (2011). ''Quality of tender documents: case studies from the UK". Construction Management and Economics, 29(3), 275-286. |
| |
| [7] | Brook, M. (2004). "Estimating and Tendering for Construction Work", 3rd ed., Elsevier, Boston: Butterworth Heinemann. |
| |
| [8] | CPI (1987). "Co-ordinating Committee for Project Information". Coordinated Project Information for Building Works, 1987. |
| |
| [9] | Hosny H. E., Ibrahim A. H., Elmalt A. E. (2019). "Factors Affecting Quality of Tender Documents". Al-Azhar University Civil Engineering Research Magazine (CERM), 41(1), 346-355. |
| |
| [10] | Bartlett, j. E., Kotrlik, W. and Higgins, C. (2001). "Organizational Research: Determining Appropriate Sample Size in Survey Research." Learning and Performance Journal, 19(1), 43-50. |
| |
| [11] | Zakaria, N. F., Dahlan, H. M., and Hussin, A. R. C. (2012). Prioritization method in the analytic "hierarchy process using evolutionary computing". International Journal of Innovative Computing, 1, 555-560. |
| |
| [12] | El-Touny, A.E. (2013). "Estimating Contingency Cost for Highway Construction Projects," MSc. Thesis, Faculty of Engineering, Zagazig University, Egypt. |
| |
| [13] | El-Malt, A.E. (2019). "Quality of Tender Documents," MSC.Thesis, Faculty of Engineering, Zagazig University, Egypt. |
| |