1Department of Industrial Engineering and management, Technical University of Košice, Faculty of Mechanical Engineering, Košice, Slovakia
2Slovak legal metrology, Banská Bystrica, Slovakia
American Journal of Mechanical Engineering.
2014,
Vol. 2 No. 7, 262-264
DOI: 10.12691/ajme-2-7-18
Copyright © 2014 Science and Education PublishingCite this paper: Miriam Pekarčíková, Peter Trebuňa, Jaromír Markovič. Time Structure Optimization of Logistics Chain during Assembly.
American Journal of Mechanical Engineering. 2014; 2(7):262-264. doi: 10.12691/ajme-2-7-18.
Correspondence to: Miriam Pekarčíková, Department of Industrial Engineering and management, Technical University of Košice, Faculty of Mechanical Engineering, Košice, Slovakia. Email:
peter.trebuna@tuke.skAbstract
There are many reasons that point to the need to deal with optimization of production processes. This article deals with improving the efficiency of the assembly process through optimization of its time structure. It is a necessary tool for ensuring growth of the organization, whether in professional or economically. The company can thus achieve a higher level of significance not only in the domestic but also foreign markets.
Keywords