1Department of Industrial Engineering, Engineering College at Alqunfudah, Umm Al-Qura University, Saudi Arabia
American Journal of Industrial Engineering.
2019,
Vol. 6 No. 1, 1-12
DOI: 10.12691/ajie-6-1-1
Copyright © 2019 Science and Education PublishingCite this paper: Jaber S. Alzahrani. Multi-objective Job Shop Scheduling under Risk Using GA.
American Journal of Industrial Engineering. 2019; 6(1):1-12. doi: 10.12691/ajie-6-1-1.
Correspondence to: Jaber S. Alzahrani, Department of Industrial Engineering, Engineering College at Alqunfudah, Umm Al-Qura University, Saudi Arabia. Email:
jszahrani@uqu.edu.saAbstract
In this study, a multi-objective job-shop scheduling model is developed to optimize makespan, maximum job tardiness and maximum and idle time of machines under risk. The model considers multi-jobs and multi-machines. Each task has a specific due date and random processing times of specific probability distribution. The model is solved using @RiskOptimizer.
Keywords