Multi-objective Job Shop Scheduling Using Pre-emptive Constraint Procedure

1Department of Industrial Engineering, Engineering College at Alqunfudah, Umm Al-Qura University, Saudi Arabia


American Journal of Modeling and Optimization. 2019, Vol. 7 No. 1, 8-13
DOI: 10.12691/ajmo-7-1-2
Copyright © 2019 Science and Education Publishing

Cite this paper:
Jaber S. Alzahrani. Multi-objective Job Shop Scheduling Using Pre-emptive Constraint Procedure. American Journal of Modeling and Optimization. 2019; 7(1):8-13. doi: 10.12691/ajmo-7-1-2.

Correspondence to: Jaber  S. Alzahrani, Department of Industrial Engineering, Engineering College at Alqunfudah, Umm Al-Qura University, Saudi Arabia. Email: jszahrani@ uqu.edu.sa

Abstract

In this paper, a multi-objective job shop scheduling through the pre-emptive constraint procedure has been formulated to optimize makespan, total earliness and total tardiness. The effectiveness of the model is studied through eighteen 3J*3M and three 10J*10M problems. The model is solved using Mosel language with Xpress software.