1Department of Industrial Engineering, Engineering College at Alqunfudah, Umm Al-Qura University, Saudi Arabia
American Journal of Modeling and Optimization.
2019,
Vol. 7 No. 1, 8-13
DOI: 10.12691/ajmo-7-1-2
Copyright © 2019 Science and Education PublishingCite this paper: Jaber S. Alzahrani. Multi-objective Job Shop Scheduling Using Pre-emptive Constraint Procedure.
American Journal of Modeling and Optimization. 2019; 7(1):8-13. doi: 10.12691/ajmo-7-1-2.
Correspondence to: Jaber S. Alzahrani, Department of Industrial Engineering, Engineering College at Alqunfudah, Umm Al-Qura University, Saudi Arabia. Email:
jszahrani@ uqu.edu.saAbstract
In this paper, a multi-objective job shop scheduling through the pre-emptive constraint procedure has been formulated to optimize makespan, total earliness and total tardiness. The effectiveness of the model is studied through eighteen 3J*3M and three 10J*10M problems. The model is solved using Mosel language with Xpress software.
Keywords