Copyright © 2017 Science and Education PublishingCite this paper: D. K. Sambariya, Rajendra Fagana. Load Frequency Control of Multi-Area Hydro Thermal Power System Using Elephant Herding Optimization Technique.
Journal of Automation and Control. 2017; 5(1):25-36. doi: 10.12691/automation-5-1-5.
Correspondence to: D. K. Sambariya, Department of Electrical Engineering, Rajasthan Technical University, Kota, India. Email:
dsambariya_2003@yahoo.comAbstract
This paper presents a novel approach to design a PID controller for load frequency control (LFC) of a hydro-thermal power plant. In the modern power system, the load frequency control of hydro-thermal power plants has widely used in frequency control due to having the fast responses. The PID controller parameters are designed using the elephant herding optimization (EHO) as an optimization technique under the minimization of error. The objective function is considered as minimization of the Integral Squared Error (ISE) for optimal design of PID parameters of the system. The prototype of hydro-thermal power plant with PID controller is simulated in MATLAB/SIMULINK platform. The dynamic responses of load frequency control using proposed controller is compared with the responses of LFC without controller and the other method of frequency control of hydro-thermal power plant in literature. The effectiveness of the proposed methodology is better in terms of settling time, rise time, peak and peak time.
Keywords