@article{ajmo2019712,
author={Alzahrani, Jaber S.},
title={Multi-objective Job Shop Scheduling Using Pre-emptive Constraint Procedure},
journal={American Journal of Modeling and Optimization},
volume={7},
number={1},
pages={8--13},
year={2019},
url={http://pubs.sciepub.com/ajmo/7/1/2},
issn={2333-1267},
abstract={In this paper, a multi-objective job shop scheduling through the pre-emptive constraint procedure has been formulated to optimize makespan, total earliness and total tardiness. The effectiveness of the model is studied through eighteen 3J*3M and three 10J*10M problems. The model is solved using Mosel language with Xpress software.},
doi={10.12691/ajmo-7-1-2}
publisher={Science and Education Publishing}
}
