<?xml version="1.0" encoding="UTF-8"?>
<records>
<record>
<language>eng</language>
<publisher>Science and Education Publishing</publisher>
<journalTitle>American Journal of Electrical and Electronic Engineering</journalTitle>
<eissn>2328-7357</eissn>
<publicationDate>2016-01-25</publicationDate>
<volume>4</volume>
<issue>1</issue>
<startPage>1</startPage>
<endPage>8</endPage>
<doi>10.12691/ajeee-4-1-1</doi>
<publisherRecordId>AJEEE2016411</publisherRecordId>
<documentType>article</documentType>
<title language="eng">Energy Crisis in Nigeria: Need for Renewable Energy Mix</title>
<authors>
<author>
<name>Tunde Olaoye</name>
<affiliationId>1</affiliationId>
</author>
<author>
<name>Titilayo Ajilore</name>
<affiliationId>2</affiliationId>
</author>
<author>
<name>Kunle Akinluwade</name>
<email>jakinluwade@yahoo.com</email>
<affiliationId>3</affiliationId>
</author>
<author>
<name>Femi Omole</name>
<affiliationId>4</affiliationId>
</author>
<author>
<name>Adelana Adetunji</name>
<affiliationId>5</affiliationId>
</author>

</authors>
<affiliationsList>
<affiliationName affiliationId="1">Department of Manufacturing Services, Prototype Engineering Development Institute, Ilesa, Nigeria</affiliationName>
<affiliationName affiliationId="2">Department of Physics and Solar Energy, BOWEN University, Iwo, Nigeria</affiliationName>
<affiliationName affiliationId="3">Department of Research and Development, Prototype Engineering Development Institute, Ilesa, Nigeria</affiliationName>
<affiliationName affiliationId="4">Department of Technical Services, Prototype Engineering Development Institute, Ilesa, Nigeria</affiliationName>
<affiliationName affiliationId="5">Department of Materials Science and Engineering, Obafemi Awolowo University, Ile-Ife, Nigeria</affiliationName>
</affiliationsList>
<abstract language="eng">Nigeria is endowed with oil and natural resources but the country cannot be said to have ever had adequate supply of electricity in the history of its electricity generation. This might get worse, as the country's population increases and economic development is calling for more demand of energy. The gradual diminishing of fossil fuels and the effort to save the eco-system from global warming has seen nations turning to alternative sources to meet their energy demands. It is therefore, imperative that renewable energy solutions be proffered to cater for Nigeria impending industrialization and its energy crisis which leaves many industries running at high cost and keeps many private homes in blackout. This paper discusses the potentials of renewable energy as an additional generation source to meet the energy demand of Nigerian populace. It focuses on the country's energy crisis and how its natural resources can be harnessed to meet the nation's energy demand while reducing global pollution. An analysis of projected energy capacities from the abundant renewable energy resources and how much of these resources are required to be harnessed in the proposed energy mix- to achieve over 60,000MW of power- was presented.</abstract>
<fullTextUrl format="pdf">http://pubs.sciepub.com/ajeee/4/1/1/ajeee-4-1-1.pdf</fullTextUrl>
<keywords language="eng"><keyword>energy crisis</keyword>
<keyword>Nigeria</keyword>
<keyword>renewable energy</keyword>
</keywords>
</record>
</records>
