American Journal of Mechanical Engineering
ISSN (Print): 2328-4102 ISSN (Online): 2328-4110 Website: http://www.sciepub.com/journal/ajme Editor-in-chief: Kambiz Ebrahimi, Dr. SRINIVASA VENKATESHAPPA CHIKKOL
Open Access
Journal Browser
Go
American Journal of Mechanical Engineering. 2016, 4(7), 258-261
DOI: 10.12691/ajme-4-7-5
Open AccessSpecial Issue

Assembly Workplace of Electrical Contacts

Ján Semjon1, , Mikuláš Hajduk1, Jozef Varga1, Rudolf Jánoš1 and Peter Marcinko1

1Department of robotics, Technical university of Kosice, Kosice, Slovakia

Pub. Date: December 17, 2016

Cite this paper:
Ján Semjon, Mikuláš Hajduk, Jozef Varga, Rudolf Jánoš and Peter Marcinko. Assembly Workplace of Electrical Contacts. American Journal of Mechanical Engineering. 2016; 4(7):258-261. doi: 10.12691/ajme-4-7-5

Abstract

The article is aimed at addressing the assembly process of electrical contacts of the two size types. The proposed solution automates the entire process of installation clamps in two sizes, with the use of robot SCARA. The workplace is composed of a rotary table with 6 positions, the two pneumatic screwdrivers, vibratory trays and conveyors. The electric contacts are used to connect cables carrying the voltages of 400 V and currents 32 or 63 A.

Keywords:
assembly workplace electrical contacts clamps process

Creative CommonsThis work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/

Figures

Figure of 5

References:

[1]  Antosz, K., Stadnicka, D.: Evaluation measures of machine operation effectiveness in large enterprises: Study results, In: Eksploatacja i Niezawodnosc – Maintenance and Reliability. Vol. 17, No. 1, (2015), p. 107-117.
 
[2]  Antosz K., Łunarski J.: Ocena konkurencyjności systemu maszyn technologicznych w procesach montażu, In: Technologia i automatyzacja montażu, No. 3 (2011), p. 65-69.
 
[3]  Baláž, V., Vagaš, M., Semjon, J.: Návrh zariadenia pre automatizovanú montáž zhášacej komory ističov, In: Strojárstvo Extra. Roč. 17, č. 4 (2013), p. 104-105.
 
[4]  Hajduk, M., et al: Testery kulačkovych vključatelej dlja elektrotechničeskoj promyšlennosti, In: TIAM - Technologia i automatyzacja montažu. No. 3 (2010), p. 23-25.
 
[5]  Łunarski, J.: Inżynieria systemów i analiza systemowa, Publisher: Oficyna Wydawnicza Politechniki Rzeszowskiej (2010), p. 302.
 
[6]  Sukop, M., et al: Increasing degree of automation of production systems based on intelligent manipulation, In: Acta Mechanica Slovaca. Roč. 15, č. 4 (2011), p. 58-63.
 
[7]  Vagaš, M., et al: The calibration issues of 3D vision system by using two 2D camera sensors, In: International Scientific Herald. Vol. 3, no. 2 (2012), p. 234-237.
 
[8]  Vagaš, M., Baláž, V., Semjon, J.: Zostavenie technického scenára montáže prepojovacej svorky pre istiace prvky, In: ATP Journal Plus. Č. 1 (2013), p. 83-85.