American Journal of Civil Engineering and Architecture
ISSN (Print): 2328-398X ISSN (Online): 2328-3998 Website: http://www.sciepub.com/journal/ajcea Editor-in-chief: Dr. Mohammad Arif Kamal
Open Access
Journal Browser
Go
American Journal of Civil Engineering and Architecture. 2021, 9(1), 23-33
DOI: 10.12691/ajcea-9-1-4
Open AccessArticle

Effect of Covid-19 Pandemic in Construction Labor Productivity: A Quantitative and Qualitative Data Analysis

Emer Tucay Quezon1, and Arthur G. Ibanez2

1IIC University of Technology, Phnom Penh, Kingdom of Cambodia

2Cagayan State University, Carig Campus, Tuguegarao City 3500, Cagayan Valley Region, Philippines

Pub. Date: March 25, 2021

Cite this paper:
Emer Tucay Quezon and Arthur G. Ibanez. Effect of Covid-19 Pandemic in Construction Labor Productivity: A Quantitative and Qualitative Data Analysis. American Journal of Civil Engineering and Architecture. 2021; 9(1):23-33. doi: 10.12691/ajcea-9-1-4

Abstract

This research aims to identify and analyze the various factors affecting construction labor productivity covering the period from December 9, 2020 - January 31, 2021, a year after it was declared Covid-19 a pandemic. Due to the pandemic effect, the local government units in four selected study areas imposed intermittent Enhance Community Quarantine on all places to control the Coronavirus spread in compliance with the health department protocol. Fifty-five questionnaires returned out of 63 distributed are tabulated according to each group-related factor. The correlation analysis resulted in the highest coefficient value of 0.89 between the CTDEO and contractor groups. Meaning, most respondents have the same perception of the factors affecting construction's low labor productivity. Besides, results depicted that the absence of health workers on the construction site ranked 1st in the health & safety provision factor group with an RII of 0.97, followed by no safety engineers on the construction project sites with an RII of 0.93. From all the seven groups of factors, the health and safety group-related factors ranked 1st with an RII of 0.81, next, the schedule compression group with an RII of 0.78. Hypothesis testing asserted that working six days per week was one of the significant factors affecting labor productivity on the contractor's side, suggested by more than 50% of the respondents. The workforce group-related factors with an RII of 0.77 demonstrated a slight difference with the schedule compression group-related factors. Thus, the Covid-19 pandemic has a significant effect on the essential factors affecting construction's low labor productivity.

Keywords:
construction labor productivity correlation analysis Covid-19 pandemic health & safety provisions hypothesis testing

Creative CommonsThis work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/

References:

[1]  Koźlak A. Role of the transport system in stimulating economic and social development. Transport economics and logistics. 2017; 72: 19-33.
 
[2]  McTague B, Jergeas G. Productivity improvements on Alberta major construction projects, construction productivity improvement report/project evaluation tool. Alberta economic development, Alberta, Canada. 2002.
 
[3]  Quezon ET, Ibanez AG. Analysis of influential factors affecting workers’ productivity on highway construction projects during Covid-19 pandemic in Cagayan Valley Region, Philippines. Global Journal of Engineering and Technology Advances. 2021, 06(02), 074-089.
 
[4]  Alaghbari W, Al-Sakkaf AA, Sultan B. Factors Affecting Construction Labor Productivity in Yemen, Intl. Journal of Construction Management. 2017; 1-13.
 
[5]  Natawidjana R, Nurasiyah R. Study of labor cost escalation in delay projects; presented at the Intl. Conference on Innovation in Research. 2020.
 
[6]  Naoum SG. Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey. International Journal of Productivity and Performance Management. 2016; 65(3): 401-421.
 
[7]  Nyando CK, Strasheim JA. Assessing Labor-based Construction Works Management Processes. Proceedings of the Institution of Civil Engineers - Management, Procurement, and Law. 2012; 164(4): 239-251.
 
[8]  Hicksona BG, Ellis A. Factors affecting Construction Labor Productivity in Trinidad and Tobago. The Journal of the Association of Professional Engineers of Trinidad and Tobago. 2014; 42: 4-11.
 
[9]  Irfan M, Zahoor H, Abbas M, Ali Y. Determinants of Labor Productivity for Building Projects in Pakistan. Journal of Construction Engineering, Management & Innovation. 2020; 3(2): 85-100.
 
[10]  Low SP, Chan YM. Managing Productivity in Construction. JIT Operations and Measurements, Brookfield (VT). 1997.
 
[11]  Thomas, HR.; Daily, J. Crew Performance Measurement via Activity Sampling. Journal of Construction Engineering and Management. 1983; 109(3): 309-320.
 
[12]  Banik GC. Construction productivity improvement. In Proceedings of the 35th ASC Annual Conference, San Luis Obispo, CA. 1999: 165-178.
 
[13]  Dabirian, S.; Khanzadi M, Taheriattar R. Qualitative Modeling of Sustainability Performance in Construction Projects Considering Productivity Approach. International Journal of Civil Engineering. 2017; 15(8): 1143-1158.
 
[14]  Al-Shahri M, Assaf S, Atiyah S, AbdulAziz A. The management of construction company overhead costs. International Journal of Project Management. 2001; 19: 295-303.
 
[15]  Cronbach, L. Coefficient alpha and the internal structure of the test. Psychometrica. 1951; 16: 297-334.
 
[16]  Mekdim M. A Study on Construction Equipment Planning and Management Problems in Road Construction Project. A Case Study: The Addis Ababa City Roads Authority. 2017. [Unpublished].
 
[17]  George D. SPSS for Windows Step by Step: A simple guide and reference. 11.0 update (4th ed.). Allyn & Bacon. 2003.
 
[18]  Gliem JA. Calculating, Interpreting, and Reporting Cronbach's Alpha Reliability Coefficient for Likert-type Scales. 2003.
 
[19]  Hedaoo H. Delay Analysis by Using Relative Importance Index Method in Infrastructure Projects. Int. J. Civil Engg. Conc.Structs. 2016.
 
[20]  Ratner B. The correlation coefficient: Its values range between + 1 / − 1. Journal of Targeting, Measurement, and Analysis for Marketing (2009) 17, 139-142.
 
[21]  Dong Z. The Relationship Between Information Technology and Construction Productivity. University of Kentucky Doctoral Dissertations. 2010; 44. Http://Uknowledge.Uky.Edu/Gradschool_Diss/44.
 
[22]  Hafez SM, Aziz RF, Morgan ES, Abdullah MM, Ahmed EK. Critical Factors Affecting Construction Labor Productivity in Egypt. American Journal of Civil Engineering. 2014; 2(2): 35-40.
 
[23]  Olomolaiye P, Kaming P, Holt G, Harris F. Factors influencing craftsmen's productivity in Indonesia. International Journal of Project Management. 1996: 21-30.
 
[24]  Mengistu M, Quezon ET, Kebede G. Assessment of Factors Affecting Labor Productivity in Road Construction Projects in Oromia Region Bale Zone. International Journal of Scientific & Engineering Research. 2016; 7(11): 899-910.